Türkerler Geothermal Power Plant - 3 Project Drainage Line Installation Works

  • Employer:  Türkerler A.Ş.
  • Year: 2017
  • Location: Manisa

As OMC Yapı, we have successfully completed the welding and installation of drainage lines along the routes between Zeytinçay 4A and Doğa 2 locations within the Türkerler Geothermal Energy A.Ş. – Phase 3 project.

During the project, mechanical installation, welding operations, and field applications of the drainage lines were carried out meticulously, ensuring timely delivery and high-quality workmanship, resulting in client satisfaction.

As the OMC team, in line with our approach of being a solution partner in industrial facility projects, we acted in this project with our principles of quality, reliability, and seamless delivery.

References
We use cookies on our website to support technical features that enhance the user experience. For detailed information click here.
Accept