Türkerler Geothermal Power Plant - 3 Project Drainage Line Installation Works
- Employer: Türkerler A.Ş.
- Year: 2017
- Location: Manisa
As OMC Yapı, we have successfully completed the welding and installation of drainage lines along the routes between Zeytinçay 4A and Doğa 2 locations within the Türkerler Geothermal Energy A.Ş. – Phase 3 project.
During the project, mechanical installation, welding operations, and field applications of the drainage lines were carried out meticulously, ensuring timely delivery and high-quality workmanship, resulting in client satisfaction.
As the OMC team, in line with our approach of being a solution partner in industrial facility projects, we acted in this project with our principles of quality, reliability, and seamless delivery.