SASA Polyester Plant Insulation Maintenance, Repair, and Construction Works
- Employer: SASA Polyester A.Ş.
- Year: 2016 - 2017
- Location: Adana
At the SASA Polyester A.Ş. production facility in Adana, turnkey maintenance, repair, dismantling, and installation of line and equipment insulation were carried out. Within the scope of the project:
- Removal and replacement of existing insulation on production lines,
- Insulation maintenance and repair applications on critical equipment,
- Installation of new insulation materials and leak-tightness checks,
- Application processes carried out in accordance with occupational safety and quality standards,
were meticulously completed.
As OMC, with our solutions aimed at increasing energy efficiency and ensuring maximum plant safety through high-temperature and high-pressure resistant insulation applications, we continue to contribute to the production continuity of SASA Polyester A.Ş.
Other Projects
References



















