Oltu Natural Gas Pipeline Construction Project

  • Employer:  BOTAŞ A.Ş. - Dimsa Yapı
  • Year: 2015 - 2017
  • Location: Erzurum

As OMC Yapı, we successfully executed the turnkey construction works of the high-pressure natural gas steel pipeline, 8 inches in diameter and approximately 59 km in length, over the Azerbaijan-Turkey (Shah Deniz) Natural Gas Pipeline. The pipeline starts with the hot-tap operation and Handere Pig Station, and ends at the Oltu Pig Station and the Oltu City Take-off Valve installed at the same site.

Within the scope of the project, one line valve and station were also installed. All mechanical and construction works were carried out meticulously and delivered on time.

As the OMC team, in line with our solution partner approach in the energy sector, we reflected our commitment to quality, safety, and project completion discipline, ensuring client satisfaction.