Delta-Rubis Dörtyol Terminal – Port Superstructure Mechanical Works
- Employer: Delta Rubis Petrol A.Ş. - Dimsa Yapı
- Year: 2014 - 2015
- Location: Dörtyol / Hatay
Within the scope of Delta-Rubis Petrol A.Ş. Dörtyol Terminal, the mechanical works of the 2,400-meter-long jetty superstructure have been successfully completed. The main activities carried out during the project are as follows:
Jetty Superstructure Pipe Bridge:
- Total of 1,200 tons of steel fabrication and installation on the jetty.
Pipelines:
- Total of 1,200 tons of steel fabrication and installation on the jetty.
- Transportation of approximately 32,000 meters of pipeline with diameters ranging from 6” to 36”,
- Detailed sandblasting and painting operations,
- 100% NDT-controlled installation.
Insulation and Fire Systems:
- Insulation of all black product lines along the entire jetty,
- Installation of the jetty fire suppression system.
Port Equipment Installation:
- Fenders,
- Ship mooring hooks and installation of other equipment.
All fabrication, installation, and testing works were completed in accordance with international quality and safety standards.