Our work items completed in the scope of our 2018 Revision Period Piping and Welding Works project, which we undertook and completed the turnkey project at Çumra Şeker Integrated Facilities are as follows;
- Reclamation of Lime Stone-Coke Coal Entry Shielding Plates
- Trigeneration Unit Feed Water Line Piping
- Wastewater Treatment Plant
- Lime Milk Line Piping
- Renewal of Pkf Sherbet Exit Lines
- Renovation of Pkf Canal Cleaning Lines
- Renewal of Pkf Drip Plate Channel Pipes
- B-Green Line Renewal
- Renewal of Afine Syrup Line
- Withdrawal of Juicy Sorbet Line
- Renewing of the Great Edge Band Drip Plate
- Line Out of Water Treatment Line to Decanter Clean Water Tank
- Vacuum Boiler Coating Work
- Maya Tank Coating Work
- Renewal of Dust Lime Line
- Welding, Piping etc. Mechanical Work Labor
All of these materials, pipes, fittings, sheet metal, etc. were supplied by OMC. This project, we undertake, has been delivered to our Employer during the campaign stance of the sugar factory that we have promised to Konya Şeker.
In addition to the above mentioned works, labor services were received from the contractor company. Our company has done only the labor service (machine equipment installation, piping, welding works, etc.), at the end of the work for all of these work as the as built projects are prepared isometric and delivered to the employer.
In addition, before the tender, our company received a qualification certificate before the tender by Konya Şeker Technical Office Directorate related to the construction of the work.
-
Turnkey Insulation Works of Sasa Polyester Plant21 Nov 2016
SASA Polyester Inc. - Production lines and equipment insulations in Adana Facility
-
Türkerler Geothermal Power Plant-3 Project Production Pipeline Mechanical Manufacturing and Erection Works01 Jul 2018
As the OMC family, as promised in the pipeline mechanical manufacturing and assembly works within the scope of TURKERLER GEOTHERMAL POWER PLANT-3 PROJECT in Alaşehir district of Manisa ‘’
-
Yeniköy - Kemerköy Engine Power Plant Fire Extinguishing System16 Sept 2018
The Automatic Fire Detection and Extinguishing Work of Yeniköy and Kemerköy Thermal Power Plants, which have been tendered by Limak & IC İçtaş, was carried out by EMO Ayvaz A.Ş. has been committed by. Projecting and material t
-
Delta-Rubis Dörtyol Terminal Port Construction Superstructure Mechanical Works01 Jul 2014
Delta-Rubis Oil Inc. 2.400 mt. The length of the scaffold