Albayrak Varaka Paper Factory 40 MW Thermal Power Plant Insulation Works

  • Employer:  Albayrak A.Ş. - Murel A.Ş
  • Year: 2018 - 2019
  • Location: Balıkesir

As OMC Yapı, we successfully completed turnkey insulation works, including materials and labor, for the boiler, auxiliary units, all equipment, and piping within the 40 MW coal-fired thermal power plant installed at Albayrak Varaka Paper Factory.

All industrial insulation applications were successfully carried out using ceramic fiber, rock wool, and rabitztelli industrial insulation blankets, covered with galvanized and aluminum cladding. As the OMC team, we prioritized client satisfaction and quality, delivering the project on time and without any deficiencies.