Commissioning

At OMC, the commissioning process ensures safe, efficient, and seamless operation of facilities. This phase involves the most critical checks performed before project handover. System testing, equipment calibration, and performance verification are conducted meticulously.

  • All mechanical and electrical systems are tested.
  • Automation and control systems are commissioned.
  • Performance verifications are conducted through operational scenarios.
  • Training is provided to operational personnel.
  • All processes are documented to ensure guaranteed handover.

Commissioning is not merely a handover stage but the most important step to ensure facilities start operating safely. Thanks to this approach, our projects are delivered to clients complete and trouble-free.