-
- Adana
- 2016 - 2017
- SASA Polyester A.Ş.
Turnkey Insulation Works of Sasa Polyester Plant21 Nov 2016SASA Polyester Inc. - Production lines and equipment insulations in Adana Facility
-
- Manisa
- 2018
- Türkerler A.Ş
Türkerler Geothermal Power Plant-3 Project Production Pipeline Mechanical Manufacturing and Erection Works01 Jul 2018As the OMC family, as promised in the pipeline mechanical manufacturing and assembly works within the scope of TURKERLER GEOTHERMAL POWER PLANT-3 PROJECT in Alaşehir district of Manisa ‘’
-
- Milas-Muğla
- 2018-2019
- Limak & IC Içtaş - EMO Ayvaz
Yeniköy - Kemerköy Engine Power Plant Fire Extinguishing System16 Sept 2018The Automatic Fire Detection and Extinguishing Work of Yeniköy and Kemerköy Thermal Power Plants, which have been tendered by Limak & IC İçtaş, was carried out by EMO Ayvaz A.Ş. has been committed by. Projecting and material t
-
- Dörtyol-Ceyhan
- 2020
- BOTAŞ A.Ş.
Dörtyol-Ceyhan Pump Station and Crude Oil Pipeline04 Aug 2020Dörtyol-Ceyhan Pump Station and Crude Oil Pipeline Construction Project is mainly;
Starting with the cold cutting from the existing discharge lines of the tanks in BOTAŞ Dörtyol Terminal and the manifold structure to be built, and ending with t -
- ALİAĞA İZMİR
- 2021
- LUBPART A.Ş
Lubpart Mineral Oil Production-Storage Tanks Manufacturing and Installation01 May 2021Lubpart Mineral Oil Production-Production of Storage Tanks and Turnkey Installation of the main,
-Lubpart A.Ş. which will be held at the Izmir Aliaga plant:
<p style="text-al
-
- Irak Besmaya
- 2020
- Tefirom Grup İnşaat Enerji San ve Ticaret
Iraq Besmaya Project Pipeline Construction01 May 2021Iraq Besmaya Project Pipeline Construction
-
09AugOMC is in new address
New Adress;
Yıldızevler District. Turan Gün...
-
27MarLapseki Natural Gas Pipe Line Project is Completed
Lapseki Natural Gas Pipe Line Project is completed at 27....
-
10FebOMC has completed 40 MW Varaka Thermal Power Plant Insulation Works.
The construction of 40 MW Thermal Power Plant, which was ...