Iraq Besmaya Project Pipeline Construction
- Project Contractor : Tefirom Grup İnşaat Enerji San ve Ticaret
- Project Year : 2020
- Project City : Irak Besmaya
As OMC Family, we have started out as a solution partner with MASS GROUP in Iraq Besmaya Project Pipeline Construction Project. The pipeline project and mapping services under out obligation have been completed. The construction of the line is planned to start in 2020. The pipeline construction consists of 7500 meters of 60" steel pipeline and 2000 meters GRP pipeline.
-
Dörtyol-Ceyhan Pump Station and Crude Oil Pipeline04 Aug 2020
Dörtyol-Ceyhan Pump Station and Crude Oil Pipeline Construction Project is mainly;
Starting with the cold cutting from the existing discharge lines of the tanks in BOTAŞ Dörtyol Terminal and the manifold structure to be built, and ending with t -
Lubpart Mineral Oil Production-Storage Tanks Manufacturing and Installation01 May 2021
Lubpart Mineral Oil Production-Production of Storage Tanks and Turnkey Installation of the main,
-Lubpart A.Ş. which will be held at the Izmir Aliaga plant: