Dörtyol-Ceyhan Pump Station and Crude Oil Pipeline
- Project Contractor : BOTAŞ A.Ş.
- Project Year : 2020
- Project City : Dörtyol-Ceyhan
Dörtyol-Ceyhan Pump Station and Crude Oil Pipeline Construction Project is mainly;
Starting with the cold cutting from the existing discharge lines of the tanks in BOTAŞ Dörtyol Terminal and the manifold structure to be built, and ending with the cold cutting and tank piping connection at the BOTAŞ Ceyhan Terminal tank area,
-Dörtyol Terminal field piping,
-Ceyhan Terminal (Tank Entry Line) field piping,
-Dörtyol Terminal Pump Station piping,
-20 inch diameter pipeline,
-Approx KP: Pig Station at 0 + 000 point,
-Approx. KP: Yukarı Burnaz Line Valve at 14 + 560 points,
-Approx. KP: Turunçlu Line Valve at 18 + 300 points,
-Approx. KP: Sarımazı Line Valve at 27 + 160 point,
-Approx KP: 36 + 732. End of the Project Ceyhan Pig Station, Ceyhan tank field connections,
it is the construction work consisting of the related material supply, facility and construction works.
-
Lubpart Mineral Oil Production-Storage Tanks Manufacturing and Installation01 May 2021
Lubpart Mineral Oil Production-Production of Storage Tanks and Turnkey Installation of the main,
-Lubpart A.Ş. which will be held at the Izmir Aliaga plant:
<p style="text-al
-
Iraq Besmaya Project Pipeline Construction01 May 2021
Iraq Besmaya Project Pipeline Construction