Yeniköy - Kemerköy Engine Power Plant Fire Extinguishing System

  • Project Contractor : Limak & IC Içtaş - EMO Ayvaz
  • Project Year : 2018-2019
  • Project City : Milas-Muğla

Three units of Kemerköy, two units of Yeniköy total five units of all thermal power plants, all burners, turbines, pump stations, oil and fuel tanks, transformers, board rooms, inclined conveyors, treatment units, administrative buildings and so on. Turnkey delivery of the gas, water and foam extinguishing systems of all general volumes. Within the scope of the relevant work, the installation of fire dampers, collector manufacturing, threaded, grooved, welded pipeline installations and mechanical workmanship of steel manufacturing and assemblies are carried out with all tests and commissioning procedures.