Completed Projects
Yeniköy - Kemerköy Engine Power Plant Fire Extinguishing System
- Project Contractor : Limak & IC Içtaş - EMO Ayvaz
- Project Year : 2018-2019
- Project City : Milas-Muğla
Three units of Kemerköy, two units of Yeniköy total five units of all thermal power plants, all burners, turbines, pump stations, oil and fuel tanks, transformers, board rooms, inclined conveyors, treatment units, administrative buildings and so on. Turnkey delivery of the gas, water and foam extinguishing systems of all general volumes. Within the scope of the relevant work, the installation of fire dampers, collector manufacturing, threaded, grooved, welded pipeline installations and mechanical workmanship of steel manufacturing and assemblies are carried out with all tests and commissioning procedures.
-
Turnkey Insulation Works of Sasa Polyester Plant21 Nov 2016
SASA Polyester Inc. - Production lines and equipment insulations in Adana Facility
-
Türkerler Geothermal Power Plant-3 Project Production Pipeline Mechanical Manufacturing and Erection Works01 Jul 2018
As the OMC family, as promised in the pipeline mechanical manufacturing and assembly works within the scope of TURKERLER GEOTHERMAL POWER PLANT-3 PROJECT in Alaşehir district of Manisa ‘’
-
Delta-Rubis Dörtyol Terminal Port Construction Superstructure Mechanical Works01 Jul 2014
Delta-Rubis Oil Inc. 2.400 mt. The length of the scaffold
Delta Rubis Dortyol Terminal Capacity increase01 May 2012Delta-Rubis Oil Inc. Dörtyol Terminal is a capacity increase. Within the scope of this work, 800 tons of pipe bridges were manufactured and assembled.