Turnkey Insulation Works of Sasa Polyester Plant
- Project Contractor : SASA Polyester A.Ş.
- Project Year : 2016 - 2017
- Project City : Adana
SASA Polyester Inc. - Production lines and equipment isolations within Adana Plant are turnkey maintenance, repair, de-assembly and assembly works.
-
Türkerler Geothermal Power Plant-3 Project Production Pipeline Mechanical Manufacturing and Erection Works01 Jul 2018
As the OMC family, as promised in the pipeline mechanical manufacturing and assembly works within the scope of TURKERLER GEOTHERMAL POWER PLANT-3 PROJECT in Alaşehir district of Manisa ‘’
-
Yeniköy - Kemerköy Engine Power Plant Fire Extinguishing System16 Sept 2018
The Automatic Fire Detection and Extinguishing Work of Yeniköy and Kemerköy Thermal Power Plants, which have been tendered by Limak & IC İçtaş, was carried out by EMO Ayvaz A.Ş. has been committed by. Projecting and material t
-
Delta-Rubis Dörtyol Terminal Port Construction Superstructure Mechanical Works01 Jul 2014
Delta-Rubis Oil Inc. 2.400 mt. The length of the scaffold
Delta Rubis Dortyol Terminal Capacity increase01 May 2012Delta-Rubis Oil Inc. Dörtyol Terminal is a capacity increase. Within the scope of this work, 800 tons of pipe bridges were manufactured and assembled.