Completed Projects
Toros Tarım Sanayi ve Ticaret A.Ş. Ceyhan Chemical Fertilizer Production Plant Insulation Works
- Project Contractor : TOROS TARIM SANAYİ VE TİCARET A.Ş.
- Project Year : 2020
- Project City : CEYHAN/ADANA
We have successfully completed the isolation works needed in the chemical fertilizer plant in TOROS TARIM SANAYİ VE TİCARET A.Ş. Ceyhan / ADANA region with our dedication and quality in all our works. Insulation needs of T-201 Tank lines have been completed by polyurethane insulation method. As OMC has made it our principle to satisfy our customers, we have completed our work with A quality materials and workmanship by prioritizing the satisfaction of our employer in this work as in our previous studies.
-
Turnkey Insulation Works of Sasa Polyester Plant21 Nov 2016
SASA Polyester Inc. - Production lines and equipment insulations in Adana Facility
-
Türkerler Geothermal Power Plant-3 Project Production Pipeline Mechanical Manufacturing and Erection Works01 Jul 2018
As the OMC family, as promised in the pipeline mechanical manufacturing and assembly works within the scope of TURKERLER GEOTHERMAL POWER PLANT-3 PROJECT in Alaşehir district of Manisa ‘’
-
Yeniköy - Kemerköy Engine Power Plant Fire Extinguishing System16 Sept 2018
The Automatic Fire Detection and Extinguishing Work of Yeniköy and Kemerköy Thermal Power Plants, which have been tendered by Limak & IC İçtaş, was carried out by EMO Ayvaz A.Ş. has been committed by. Projecting and material t
-
Delta-Rubis Dörtyol Terminal Port Construction Superstructure Mechanical Works01 Jul 2014
Delta-Rubis Oil Inc. 2.400 mt. The length of the scaffold