Oltu Natural Gas Pipe Line Project
- Project Contractor : BOTAŞ A.Ş. - Dimsa Yapı
- Project Year : 2015 - 2017
- Project City : Erzurum
42 inches in diameter Azerbaijan-Turkey (Shahdeniz) Beginning with the Natural Gas hot-tap operation of the pipeline and establishment of Handera Pig Station Olten Pig Station and the pig station with the same pitch in the plant is Olten city Take-off that ended with Valve approximately 59 High pressure natural gas steel pipeline with a length of 8 inches in length is the work of turnkey construction. There are also one line valve and station in the project.
-
Turnkey Insulation Works of Sasa Polyester Plant21 Nov 2016
SASA Polyester Inc. - Production lines and equipment insulations in Adana Facility
-
Türkerler Geothermal Power Plant-3 Project Production Pipeline Mechanical Manufacturing and Erection Works01 Jul 2018
As the OMC family, as promised in the pipeline mechanical manufacturing and assembly works within the scope of TURKERLER GEOTHERMAL POWER PLANT-3 PROJECT in Alaşehir district of Manisa ‘’
-
Yeniköy - Kemerköy Engine Power Plant Fire Extinguishing System16 Sept 2018
The Automatic Fire Detection and Extinguishing Work of Yeniköy and Kemerköy Thermal Power Plants, which have been tendered by Limak & IC İçtaş, was carried out by EMO Ayvaz A.Ş. has been committed by. Projecting and material t
-
Delta-Rubis Dörtyol Terminal Port Construction Superstructure Mechanical Works01 Jul 2014
Delta-Rubis Oil Inc. 2.400 mt. The length of the scaffold