Completed Projects
Lapseki Natural Gas Pipe Line Project
- Project Contractor : BOTAŞ A.Ş.
- Project Year : 2018
- Project City : Lapseki Çanakkale
36 inches in diameter Turkey - Greece (Faz1) Natural Gas Pipeline from hot-tap operation and establishment of Değirmencik Pig Station Starting with Lapsike Line Valve Station and the city Take-off valves with terminated approximately 43 km long 16 inch diameter high pressure natural The gas steel pipeline is the work of turnkey construction. There are also one line valve and station in the project.
-
Turnkey Insulation Works of Sasa Polyester Plant21 Nov 2016
SASA Polyester Inc. - Production lines and equipment insulations in Adana Facility
-
Türkerler Geothermal Power Plant-3 Project Production Pipeline Mechanical Manufacturing and Erection Works01 Jul 2018
As the OMC family, as promised in the pipeline mechanical manufacturing and assembly works within the scope of TURKERLER GEOTHERMAL POWER PLANT-3 PROJECT in Alaşehir district of Manisa ‘’
-
Yeniköy - Kemerköy Engine Power Plant Fire Extinguishing System16 Sept 2018
The Automatic Fire Detection and Extinguishing Work of Yeniköy and Kemerköy Thermal Power Plants, which have been tendered by Limak & IC İçtaş, was carried out by EMO Ayvaz A.Ş. has been committed by. Projecting and material t
-
Delta-Rubis Dörtyol Terminal Port Construction Superstructure Mechanical Works01 Jul 2014
Delta-Rubis Oil Inc. 2.400 mt. The length of the scaffold