Completed Projects
İscehisar - Yalvaç Cities Natural Gas Pipe Line Project
- Project Contractor : BOTAŞ A.Ş. - Dimsa Yapı
- Project Year : 2015 - 2017
- Project City : Afyon
It starts with Devuz Pig station starting from Susuz Pig station and starting with Devinizesi Pig station, which is started by Susuz Pig station and installed by hot-tap operation in Konya - Isparta Natural Gas Pipeline with a diameter of 16 inches, it is about 15 km to İscehisar. Yalvaç is a construction work of a 36-foot-wide high-pressure natural gas steel pipeline with a length of 51 km. Within the scope of the project, there are four pig stations and one line valve station.
-
Turnkey Insulation Works of Sasa Polyester Plant21 Nov 2016
SASA Polyester Inc. - Production lines and equipment insulations in Adana Facility
-
Türkerler Geothermal Power Plant-3 Project Production Pipeline Mechanical Manufacturing and Erection Works01 Jul 2018
As the OMC family, as promised in the pipeline mechanical manufacturing and assembly works within the scope of TURKERLER GEOTHERMAL POWER PLANT-3 PROJECT in Alaşehir district of Manisa ‘’
-
Yeniköy - Kemerköy Engine Power Plant Fire Extinguishing System16 Sept 2018
The Automatic Fire Detection and Extinguishing Work of Yeniköy and Kemerköy Thermal Power Plants, which have been tendered by Limak & IC İçtaş, was carried out by EMO Ayvaz A.Ş. has been committed by. Projecting and material t
-
Delta-Rubis Dörtyol Terminal Port Construction Superstructure Mechanical Works01 Jul 2014
Delta-Rubis Oil Inc. 2.400 mt. The length of the scaffold