Delta-Rubis Dörtyol Terminal Port Construction Superstructure Mechanical Works

  • Project Contractor : Delta Rubis Petrol A.Ş - Dimsa Yapı
  • Project Year : 2014-2015
  • Project City : Dörtyol-Hatay

Delta-Rubis Oil Inc. 2.400 mt. The length of the scaffolding of the superstructure is the job of mechanical work. The pipe bridge on the scaffold, 1200 tons of steel fabrication and installation on the scaffold have been successfully completed. Located on the pier between 6 "-36" approximately 32,000 mt. The pipe was transported and sandblasted in detail and assembled with 100% NDT. Also; The insulation works of the black product lines along the whole pier, the installation of the fire system of the whole pier and the installation of equipment such as fender and ship anchor hook for the pier have been successfully completed.