Delta-Rubis Dörtyol Terminal Port Construction Superstructure Mechanical Works
- Project Contractor : Delta Rubis Petrol A.Ş - Dimsa Yapı
- Project Year : 2014-2015
- Project City : Dörtyol-Hatay
Delta-Rubis Oil Inc. 2.400 mt. The length of the scaffolding of the superstructure is the job of mechanical work. The pipe bridge on the scaffold, 1200 tons of steel fabrication and installation on the scaffold have been successfully completed. Located on the pier between 6 "-36" approximately 32,000 mt. The pipe was transported and sandblasted in detail and assembled with 100% NDT. Also; The insulation works of the black product lines along the whole pier, the installation of the fire system of the whole pier and the installation of equipment such as fender and ship anchor hook for the pier have been successfully completed.
-
Turnkey Insulation Works of Sasa Polyester Plant21 Nov 2016
SASA Polyester Inc. - Production lines and equipment insulations in Adana Facility
-
Türkerler Geothermal Power Plant-3 Project Production Pipeline Mechanical Manufacturing and Erection Works01 Jul 2018
As the OMC family, as promised in the pipeline mechanical manufacturing and assembly works within the scope of TURKERLER GEOTHERMAL POWER PLANT-3 PROJECT in Alaşehir district of Manisa ‘’
-
Yeniköy - Kemerköy Engine Power Plant Fire Extinguishing System16 Sept 2018
The Automatic Fire Detection and Extinguishing Work of Yeniköy and Kemerköy Thermal Power Plants, which have been tendered by Limak & IC İçtaş, was carried out by EMO Ayvaz A.Ş. has been committed by. Projecting and material t
-
Delta Rubis Dortyol Terminal Capacity increase01 May 2012
Delta-Rubis Oil Inc. Dörtyol Terminal is a capacity increase. Within the scope of this work, 800 tons of pipe bridges were manufactured and assembled.