Delta Rubis Dortyol Terminal Capacity increase
- Project Contractor : Delta Rubis Petrol A.Ş - Dimsa Yapı
- Project Year : 2012-2013
- Project City : Dörtyol-Hatay
Delta-Rubis Oil Inc. Dörtyol Terminal is a capacity increase. Within the scope of this work, 800 tons of pipe bridges were manufactured and assembled. The new Bunker-Import tanks are manufactured from 2 ”-18 14 to 14,000 mt. pipe was moved and sandblasted painting and assembly with 100% NDT was done. Insulation works and fire extinguishing systems of newly constructed tanks were carefully made throughout the new site of the black product lines. New pump canopy and fuel pumps were installed and commissioned together with the collectors. Tanker loading-unloading and heating islands have been established and meticulously done by our expert teams in pipe installation business.
-
Turnkey Insulation Works of Sasa Polyester Plant21 Nov 2016
SASA Polyester Inc. - Production lines and equipment insulations in Adana Facility
-
Türkerler Geothermal Power Plant-3 Project Production Pipeline Mechanical Manufacturing and Erection Works01 Jul 2018
As the OMC family, as promised in the pipeline mechanical manufacturing and assembly works within the scope of TURKERLER GEOTHERMAL POWER PLANT-3 PROJECT in Alaşehir district of Manisa ‘’
-
Yeniköy - Kemerköy Engine Power Plant Fire Extinguishing System16 Sept 2018
The Automatic Fire Detection and Extinguishing Work of Yeniköy and Kemerköy Thermal Power Plants, which have been tendered by Limak & IC İçtaş, was carried out by EMO Ayvaz A.Ş. has been committed by. Projecting and material t
-
Delta-Rubis Dörtyol Terminal Port Construction Superstructure Mechanical Works01 Jul 2014
Delta-Rubis Oil Inc. 2.400 mt. The length of the scaffold