Completed Projects
Construction of 40 mw Thermal Power Plant Isolation Works of Albayrak Varaka Paper Factory
- Project Contractor : Albayrak A.S. - Murel A.S.
- Project Year : 2018-2019
- Project City : Balıkesir
The construction of the 40 MW coal bed thermal power plant built into the Albayrak Varaka Paper Factory is the turn-key construction of the boiler, auxiliary units and all equipment and pipes, including the materials and workmanship. In this project where all the industrial isolation applications are applied, ceramic fiber, industrial wool mattresses with industrial wool wool and galvanized and aluminum coatings are used.
-
Turnkey Insulation Works of Sasa Polyester Plant21 Nov 2016
SASA Polyester Inc. - Production lines and equipment insulations in Adana Facility
-
Türkerler Geothermal Power Plant-3 Project Production Pipeline Mechanical Manufacturing and Erection Works01 Jul 2018
As the OMC family, as promised in the pipeline mechanical manufacturing and assembly works within the scope of TURKERLER GEOTHERMAL POWER PLANT-3 PROJECT in Alaşehir district of Manisa ‘’
-
Yeniköy - Kemerköy Engine Power Plant Fire Extinguishing System16 Sept 2018
The Automatic Fire Detection and Extinguishing Work of Yeniköy and Kemerköy Thermal Power Plants, which have been tendered by Limak & IC İçtaş, was carried out by EMO Ayvaz A.Ş. has been committed by. Projecting and material t
-
Delta-Rubis Dörtyol Terminal Port Construction Superstructure Mechanical Works01 Jul 2014
Delta-Rubis Oil Inc. 2.400 mt. The length of the scaffold