48" East Anatolian Natural Gas Main Transmission Line 2nd Section Insulation Damage Repair Works
- Project Contractor : BOTAŞ A.Ş.
- Project Year : 2018
- Project City : Erzincan - Erzurum
BOTAŞ Pipelines and Petroleum Transportation Inc. - Within the scope of the work carried out by the Erzurum Branch Directorate, 156 insulation damage on 48" Eastern Anatolia Natural Gas Main Transmission Line Section 2 has been successfully repaired.
Excavations were carried out by BOTAŞ and OMC teams on high-pressure and live-running lines. Excavators and wheeled excavators were used during the excavation work carried out at the highest level of occupational safety measures. After approaching a certain distance to the existing pipe, damage points were detected by hand excavation. Insulation coverings of these points were peeled off by physical cleaning method and the damages were repaired by hot winding method.
-
Turnkey Insulation Works of Sasa Polyester Plant21 Nov 2016
SASA Polyester Inc. - Production lines and equipment insulations in Adana Facility
-
Türkerler Geothermal Power Plant-3 Project Production Pipeline Mechanical Manufacturing and Erection Works01 Jul 2018
As the OMC family, as promised in the pipeline mechanical manufacturing and assembly works within the scope of TURKERLER GEOTHERMAL POWER PLANT-3 PROJECT in Alaşehir district of Manisa ‘’
-
Yeniköy - Kemerköy Engine Power Plant Fire Extinguishing System16 Sept 2018
The Automatic Fire Detection and Extinguishing Work of Yeniköy and Kemerköy Thermal Power Plants, which have been tendered by Limak & IC İçtaş, was carried out by EMO Ayvaz A.Ş. has been committed by. Projecting and material t
-
Delta-Rubis Dörtyol Terminal Port Construction Superstructure Mechanical Works01 Jul 2014
Delta-Rubis Oil Inc. 2.400 mt. The length of the scaffold